One Example of Improvement

There are a lot of things I am coming across that I can’t just pass up. That is why it is taking longer than I thought. One example is below. The first picture is the old shelf and the second is the new shelf. I had to buy the lumber, cut to fit, sand, and stain it with two coats. The floor is almost done also.

Shelf with water damage

Shelf with water damage

New shelf

New shelf

Image

Linoleum in!

20140413-231148.jpg

20140413-231159.jpg

I installed the linoleum over the repaired floor. If is the first time I installed sheet linoleum. This linoleum will only be seen inside the cabinets. I have included a close up of the linoleum and the floor covering I’m going to use. I am now working on changing out all the copper plumbing to PEX. The floor was tough. I’m hoping I will still be polishing in May!